Structural demolition, interior demolition and type 1, 2 and 3 (including supplied air) asbestos abatement throughout the 9 story Rundle Tower, 5 Story A Wing, Council Chamber and B Wing. Type 2 and 3 asbestos abatement of pipe insulation throughout all 3 levels of the armoury. Re-insulation of all pipes and fittings. Type 3 abatement of vermiculite insulation in the attic spaces of 16 married quarters. Type 1, 2 & 3 asbestos abatement of various building materials. Type 2 abatement of lead paint. Level 3 mould remediation. Interior demolition. 8-month groundwater clean-up program. Type 2 asbestos abatement of various building materials. Level 3 mould remediation. Scheduling and phasing to accommodate church masses, funerals and events. 3 R’s Demolition of 95 houses. Type 2 & 3 asbestos abatement in all units. Level 3 mould remediation. Application of moisture control system over concrete floor. Removal of gas pumps and underground fuel tanks. Remediation of contaminated soils. Type 3 asbestos abatement of various building materials. Demolition of building. Re-grading and landscaping. Permanent fencing. Asbestos abatement of various building materials. Abatement of lead paint. Demolition of five buildings. Clean up of fire extinguisher dust over a 70,000 sf college facility Level 2 & 3 mould remediation. Structural repairs. Restoration of damaged building materials. Waterproofing of foundations. Mechanical and electrical repairs. Level 3 mould remediation. Restoration of damaged building materials. Waterproofing of foundations. Mechanical and electrical repairs. Type 3 asbestos abatement. Demolition of building. Type 3 asbestos abatement. Removal of Urea Formaldehyde. Demolition of building. Level 3 mould remediation. Restoration of damaged building materials. Waterproofing of foundations. Electrical repairs.

Back to Previous Page